How we work

We break the design process down step by step. No complicated wording or abstract theory - point by point and with clear examples, so the whole process of designing a house is easier to follow.

The first meeting with the architect is the most important part of the project. Set aside 2-4 hours for a detailed discussion of the brief.

We do not stop at the number of rooms and storeys. We go through how you live in detail: the size of the bed, whether you want a television in the bedroom, where the kitchen sink should sit, what garden tools you keep, the sanitaryware in every bathroom, bicycles, the Christmas tree and much else. We talk through each room separately.

We always keep the budget in mind and do not propose solutions that would make the house substantially harder to build, or that the builders would not be able to carry out.

The more thoroughly the brief is worked out, the closer the first design option is to the house you had in mind.

Let us make sense of the abbreviations used in private house design.

Preliminary area and final area - what is the difference?

The first layout iteration rarely becomes the final one, and that is completely normal.

Every presentation of the layout and facade concept comes with a detailed video explaining the decisions, and a virtual walk through the house.

After every iteration we collect feedback from the client.

In our experience, the АР ЭП stage for a house of about 500 m² takes one to two months.

The time a client needs to make decisions and give feedback is not included in the design schedule.

Choosing the facade materials is a separate and interesting stage of the work.

We do not take on a large number of projects at once.

Every project of ours has its own name.

After the АР ЭП stage, work on the project continues in several directions at once.

Once all the specialists are involved, a project manager is assigned to the project.

No stage of the project sits idle.

Something that is not obvious about the engineering.

By the end of the design you will have volumes of documentation (you could have saved the money on wallpaper).

In construction everyone wants to have started yesterday. We understand that very well.

Who a technical supervisor is, and why you need one on site.

Who is responsible for what on site.

Author's supervision for the АР and КР sections. How it works with us in practice.

The client has their own team of specialists. That is not a problem.